Benefits of the automatic equipment VS manual equipment:
100% SAFETY OPERATION
Avoid work at height preventing falls from different level.
Safe work in adverse climatologic conditions.
AUTOMATIC HOOKING AND UNHOOKING
Time saved in the load hooking and unhooking operations.
Increase in the ratio per hour, reducing shifts and stay length of the vessel at the port.
Reduction of unload/load rates from trucks.
Times
Hook alongside ship on truck
Manual- 4 minutes
Auto Shackle NOA – 30 seconds
Manual unhook in hold
Manual – 3 minutes
Auto Shackle NOA -10 seconds
Total manual – 7 minutes
Total Auto Shackle NOA – 40 secs.
DIFFERENCE:6’20” saved/unit
Prevent damages caused in tubes by the shackles in the hooking and unhooking.
Prevent damages in tubes caused by the use of J Hooks.
Use of a retractable system in zero gravity and withdrawal of the shackle in order to avoid damaging the tube.
Reduction of personnel required, applicable to all processes of the logistic chain (handling and load at factory, receipt at destination, etc.)
Prevent problems to release the shackle due to lack of space.
Optimization of the hold’s space.
Open/lock control system with indicator LED lighting (red open/green locked).
LOAD OPERATIONS
3 minutes per unit saved in the load hooking operations (alongside ship).
2.5 minutes per unit saved in unload operations.
That means that in some cases the cost of a work shift can be saved.
Reduction of the shipping cost because the load operations will be quicker (depending on the number of units to be stowed).
1 docker saved per shift (alongside ship) and 2 dockers saved per shift (on board).
Elimination of the cherry picker cost in those ports where it is used.
There is no need to open/close the tarpaulin.
Cost-cut regarding the flaws repairs caused by the shackles and by the J hooks that damage the ends brims.
RECEIPT AT STOCKPILE ZONE
Very quick unloading from truck.
2.5 minutes/unit saved in unloading operations from truck.
Required 2 dockers less in the receipt operation.
Elimination of the cherry picker cost in those ports where it is used.
There is no need to open/close the tarpaulin.
Cost-cut regarding the flaws repairs caused by the shackles and by the J hooks in the ends brims.
LOADING AND SHIFT ALONGSIDE SHIP FROM 2nd QUAY LINE
3.3 minutes/unit saved in the loading operations to truck..
Required 2 dockers less per working shift in the shift operations.
Elimination of the cherry picker cost in those ports where it is used.
There is no need to open/close the tarpauliN.
Cost-cut regarding the flaws repairs caused by the shackles and by the J hooks in the ends brims.
VERSATILITY: USE
WIND TURBINE COMPONENTS
TOWER SECTIONS
NACELLES
HUBS
PROJECT CARGO
SPECIAL CARGO
BLAST FURNACE ELECTRODES
STEEL COILS
….
Este sitio web utiliza cookies propias y/o de terceros para mejorar nuestros servicios, elaborar información estadística y optimizar su navegación. Puede consultar mas información en nuestra política de cookies.
Este sitio utiliza cookies funcionales y scripts externos para mejorar tu experiencia. A la izquierda se especifica qué cookies y scripts se usan y cómo impactan en tu visita. Puedes cambiar tus ajustes en cualquier momento. Tus decisiones no tendrán impacto en tu visita. Más información
NOTA: Estos ajustes solo se aplicarán al navegador y dispositivo que estés usando actualmente.